Bereke Group
Bereke Group
Design & Build
Bereke Group private house construction in Almaty
Almaty and region

House Construction in Almaty

An engineering-first approach to private house construction, from site review and geology to handover with a transparent estimate and systematic control.

Private house construction experience since 2019
Geology, design, and estimate fixed in the contract
Engineering control at every stage
View projects

Free consultation • Site visit • Preliminary estimate

Choose your scenario

We can step in at any preparation stage, from site review to a completed project.

What is included in house construction

A managed process with clear stages, from site and design to delivery with engineering control.

Site analysis and geology
Preparation
01

Site analysis and geology

Site visit, geological surveys, topography, engineering conditions review, and preparation of the initial design data.

Architectural and structural design
Design
02

Architectural and structural design

Planning solutions, facades, structural calculations, and engineering systems in a project adapted to your site.

Detailed estimate fixed in the contract
Estimate
03

Detailed estimate fixed in the contract

A full calculation of materials, works, and equipment with a transparent estimate before construction starts and no hidden extras.

Shell and roof construction
Delivery
04

Shell and roof construction

Foundation, walls, slabs, and roofing system delivered with staged quality control and compliance with the technology.

Engineering systems and utilities
Engineering
05

Engineering systems and utilities

Heating, ventilation, water supply, drainage, and electrical works for the full engineering infrastructure of a modern home.

Supervision and quality control
Control
06

Supervision and quality control

Engineering supervision at every stage, including project compliance checks, material control, and workmanship review.

Facade, windows, and handover preparation
Finish
07

Facade, windows, and handover preparation

Window installation, facade packages, junction checks, and preparing the house for the next finishing phase or client handover with a clear scope of completed work.

House formats

We work with different architectural scenarios and site conditions, so the format should match the task and the plot instead of forcing one generic solution.

How to choose the house format

Plot size

A single-storey house requires a larger building footprint, while a two-storey house saves more site area.

Relief

If the site has a slope or a height difference, we adapt the architecture to the landscape.

Area and lifestyle scenario

We help choose the right configuration based on family structure, lifestyle, and the target floor area.

Two-storey contemporary house by Bereke Group
Popular format

Two-storey houses

Maximum usable area on a compact plot

The optimal solution when you need a large home but the plot is limited. Two levels help separate public and private zones, reduce the footprint, and preserve more open space for the yard and landscape.

Area
200-400 m²
Plot from
6-8 sotkas
Timeline
12-14 months
Single-storey contemporary house by Bereke Group
120-250 m²

Single-storey houses

When access to all spaces on one level matters most

Comfort without stairs, simpler day-to-day use, and a straightforward living logic. Best for larger plots and scenarios that do not require a large area across two levels.

Contemporary flat-roof house by Bereke Group
Flat roof

Contemporary flat-roof architecture

When the architectural language is part of the decision itself

Minimalist aesthetics, clean geometry, and the option of a usable roof. It requires precise engineering and high-quality execution.

House on complex terrain by Bereke Group
Slope

Houses on complex terrain

When the site has a slope or noticeable elevation change

We adapt the architecture to the relief, using terracing and integrated levels to turn site constraints into an architectural advantage.

Contemporary compact house for a smaller plot by Bereke Group
Compact plot

Houses for compact plots

When it is important to preserve yard space and avoid an oversized footprint

We shape the architecture around a limited plot size: a compact volume, efficient planning, and enough privacy without making the house feel constrained.

Our approach

Why it is safer to build a house with Bereke Group

We do not operate like a typical contractor. We work as a systems-driven team with transparency, control, and digital visibility across the process.

Bereke Group engineering team planning a construction project

A managed process instead of construction chaos

A typical contractor runs a build on intuition. Bereke Group works like an engineering team with digital control, transparent estimates, and a systematic logic at every stage.

Engineering-first project management
Systematic control at every stage
Transparent process and communication
Digital visibility of construction

Transparent estimate with no hidden extras

A detailed calculation of every cost item before work starts. The price is fixed in the contract, so you see the full cost structure and keep budget control throughout the project.

Control of hidden works and quality

Photo documentation of foundations, reinforcement, and utilities before they are covered. Materials are checked through lab validation, and technical supervision is present at every stage.

One team from geology to handover

A single line of responsibility without handoffs between contractors. One contract, one team, one project manager, so you always know who is accountable.

Digital client cabinet

Online access to the schedule, budget, photos, videos, and documents 24/7. All project information is collected in one place.

A systematic approach reduces risk and gives control

Building a house means managing budget, quality, contractor coordination, and transparent communication. Bereke Group manages this as an engineering process rather than as a chaotic construction site.

Ready-made solutions

House project catalog

Choose a project by style, area, and lifestyle scenario, adapt it to your site, and discuss the build.

Osaka 1Osaka 2Osaka 3
Minimalism

Osaka

455.2 м²
1 floor
fromKZT 73M
4 bedrooms
3 bathrooms
Garage
Terrace
Minimalism
Brick
View project
Miami 1Miami 2Miami 3Miami 4
Hi-tech

Miami

420 м²
1 floor
fromKZT 67M
3 bedrooms
2 bathrooms
Garage
Terrace
Hi-tech
Brick
View project
Cape Town 1Cape Town 2Cape Town 3
Hi-tech

Cape Town

505 м²
2 floors
fromKZT 76M
5 bedrooms
4 bathrooms
Garage
Terrace
Hi-tech
Brick
View project
Vancouver 1Vancouver 2Vancouver 3Vancouver 4
Hi-tech

Vancouver

400 м²
2 floors
fromKZT 66M
3 bedrooms
2 bathrooms
Terrace
Hi-tech
Brick
brick
View project
Helsinki 1Helsinki 2Helsinki 3
Hi-tech

Helsinki

678.3 м²
2 floors
fromKZT 78M
4 bedrooms
3 bathrooms
Garage
Terrace
Hi-tech
Brick
Premium exterior
View project
Oslo 1Oslo 2Oslo 3
Modern

Oslo

331.8 м²
2 floors
fromKZT 53M
3 bedrooms
2 bathrooms
Garage
Modern
Brick
View project

Not sure which project fits your site?

We can adapt a ready-made solution or develop an individual project for you.

How house construction progresses

Six key construction stages, from geology to handover. At every stage we control the things that affect the quality, safety, and long-term durability of your home.

Geology and site preparation before house construction
01

Geology and site preparation

Geological surveys, topographic measurements, and engineering-condition analysis. We identify the soil type, groundwater level, and bearing capacity, which are critical inputs for the foundation.

Why it matters

A mistake at this stage leads to cracks, foundation settlement, and rework worth millions of tenge.

What we control

We carry out surveys to code, analyse the results, and adapt the project to the real conditions of the plot.

Reinforcement and foundation pouring for a private house
02

Earthworks, reinforcement, and foundation pouring

Excavation, reinforcement according to the design, and concrete pouring with quality control of the mix. The foundation is the structural base of the home for 50+ years.

Why it matters

The foundation cannot be redone after the house is built. Quality at this stage determines the durability of the whole structure.

What we control

We check reinforcement spacing, concrete grade, curing conditions, and geometry before pouring.

Construction of the structural shell and load-bearing elements
03

Structural shell: walls, columns, slabs

Construction of load-bearing walls, monolithic columns, and floor slabs. Each level is checked for project compliance, geometry, and structural alignment.

Why it matters

Geometry errors in the shell create downstream problems for finishes, windows, and doors. Structural strength also affects seismic performance.

What we control

We control compliance with the structural scheme, wall thickness, concrete quality, and vertical alignment at every level.

Roofing, waterproofing, and insulation installation on a house
04

Roofing, waterproofing, and thermal envelope

Installation of the roofing system, waterproofing, and insulation. We create protection from weather and build the energy-efficient envelope of the house.

Why it matters

Mistakes in roofing and insulation become visible in winter through freezing, leaks, mould, and higher heating bills.

What we control

We inspect junction details, insulation thickness, waterproofing quality, and roof ventilation before closing the system.

Installation of engineering systems in a private house
05

Engineering systems and hidden-work control

Installation of heating, water supply, drainage, ventilation, and electrical systems. We document the routing before finishing begins because it will later be permanently hidden.

Why it matters

Hidden systems cannot be inspected after finishing. A leak or a short circuit would require opening walls.

What we control

We verify routing, drainage slopes, system pressure tests, and compliance with the design. All utilities are photo-documented.

House facade works and final inspection
06

Facade, finish readiness, and final inspections

Facade execution, final system checks, and preparation for interior finishing. We review every system and detail before handover.

Why it matters

The final inspection reveals hidden defects before they become expensive ownership problems.

What we control

We commission engineering systems, check facade weather-tightness, and test heating, water, and electrical systems.

At every stage you receive photo reports, see the current status in the digital cabinet, and can ask questions directly to the supervising engineer.

A transparent process from plot to keys

Pricing logic

House cost is calculated from the total area. The larger the home, the lower the price per m².

Economy of scale

As the house area grows, fixed costs are spread across more square meters, so the price per m² goes down.

150 м²
Цена за м²
400,000
Итого: 60M
250 м²
Цена за м²
350,000
Итого: 87.5M
350 м²
Цена за м²
300,000
Итого: 105M

* These are indicative values for a typical two-storey home. The exact estimate depends on the project parameters.

What affects the final price

Besides floor area, the final price depends on the architectural, structural, and engineering parameters of the project.

Total house area

Primary factor

The larger the area, the lower the price per m² due to the scale effect.

Architectural complexity

High impact

Simple geometry is less expensive than complex forms and non-standard design solutions.

Roof type

Medium impact

Flat and pitched roofs differ in both execution technology and cost.

Selected materials

Medium impact

Structural and finishing materials account for a meaningful share of the budget.

Site relief

Medium impact

A flat site is less expensive than a slope because it needs less preparation and earthworks.

Engineering solutions

Medium impact

The complexity of heating, ventilation, and automation systems directly affects the budget.

Completion level

High impact

A shell-ready home and a fully completed home imply different scopes of work.

The price is fixed in the contract, with no hidden extras

After the contract is signed, the cost does not change. You will not face unexpected expenses during construction because the estimate is detailed and fixed from the start.

Detailed estimate
Fixed in contract
Predictable budget

Want to understand your budget range? Fill in a short form and we will estimate the cost for your parameters.

Free consultation • Estimate by area and parameters • Initial project assessment

Digital client service

Client cabinet: construction under control

We built a digital platform for transparent client interaction. No anxiety and no uncertainty, only clarity, control, and continuous access to project information.

Stage tracking

Real-time visibility into construction progress

Photo and video records

Documentation of work at every stage

Document access

All contracts, acts, and project files in one place

Direct team communication

Fast contact with the project manager and site foreman

Event notifications

Alerts when stages are completed and key events happen

Learn more about the cabinet
Trust and accountability

Warranties, licenses, and quality control

Licenses, warranties, and quality control are built into the process from approvals through every stage handover.

Licenses and approvals

Kazakhstan licenses for design and construction are available for verification
Approvals and contractor coverage span all key work packages

Warranties and responsibility

A fixed contract estimate protects you from hidden add-ons
5 years for the structure and 3 years for engineering systems

Quality control and supervision

Technical and author supervision are involved at key delivery stages
Material testing and three-level acceptance are part of execution
On-site control
Technical supervision

On-site control

Stage inspections, material checks, and three-level acceptance of completed work.

Laboratory
Laboratory
Documents
Documents

Complete document package

Licenses, certificates, warranty terms, and the contract framework in one place.

View documents
Engineering approach

Technology and materials

We select the right technology for the architecture, budget, and timeline. Every solution has clear strengths and trade-offs.

Compare by the key criteria

Durability
Structural service life
Timeline
Speed of construction
Freedom of form
Architectural possibilities
Budget
Implementation cost
Brick
Brick
Premium classic
100+ years of durability
Higher cost and longer delivery
When to choose

Classical and neoclassical architecture, premium residences

Budget
Premium
Timeline
12-18 mo
Freedom
High
Durability
Max
AAC block
AAC block
Balanced speed and cost
Optimal price-to-quality ratio
Height limitations apply
When to choose

Modern suburban homes up to 3 floors and fast-track projects

Budget
Medium
Timeline
8-12 mo
Freedom
Medium
Durability
High
Monolith
Monolith
Architectural freedom
Maximum freedom of form
Higher labor intensity
When to choose

Signature architecture, large spans, cantilevers, and demanding sites

Budget
Premium+
Timeline
14-20 mo
Freedom
Max
Durability
Max

How we select the technology

1
Architectural concept review
House style, form complexity, span sizes, and cantilevers
2
Budget and timeline assessment
The balance between cost, speed, and implementation quality
3
Site condition analysis
Soils, terrain, access, and climate zone
4
Engineering control of delivery
Control of nodes, reinforcement, concrete, and material quality
Engineering control
Quality control

We design the key nodes, control materials, reinforcement, and concrete, and provide technical supervision through every stage.

Answers to questions

Frequently asked questions

We answer the main questions about house construction, from timelines to quality control.

Timelines depend on the technology and floor area. A 200-300 m² gas block house usually takes 8-12 months, a brick house 12-18 months, and a monolithic house 14-20 months. The schedule is fixed in the contract with stage breakdowns and control points.
The cost is formed by the floor area, selected technology, architectural complexity, finish level, and engineering systems. We show a transparent price structure before the contract is signed.
Yes. The estimate is fixed in the contract with a detailed breakdown by cost item and stage. Changes only happen by agreement with you, for example if you change the layout or upgrade materials. There are no hidden extras.
Yes, we work with ready-made projects. Our engineers review them for compliance with local standards, adapt them to your site and soil conditions, refine them when needed, and then deliver the construction.
That is a common situation. We start with site analysis, then develop the project around your goals, align the estimate, and move into construction. The full cycle stays within one responsible team.
You get access to an online platform with photo and video reports, work schedules, and stage statuses. You also have a manager in touch, regular calls, and the option to visit the site. You always know what is happening.
We manage the full cycle: site analysis, geology, project work, shell construction, engineering systems, quality control, and preparation for handover or turnkey completion in the agreed scope.
Within the day, a manager contacts you, clarifies the task, shares budget guidance and relevant project examples. Then we move to a meeting or call, followed by site analysis, project work, estimate, and contract if the scenario fits.

Still have questions?

We can discuss your project, show relevant examples, prepare an estimate, and answer your questions without pressure or obligation.

Message on WhatsApp

Start discussing your project

Choose the most convenient way to connect and we will help you estimate the budget and define the next step.

Message on WhatsApp

The fastest way to reach out and ask the first project questions.

What happens after your request

1

You send the input

Site plan, project, references, or a description of the task.

2

We analyze the brief

The team reviews the parameters and prepares a preliminary assessment.

3

You receive the response

You get a budget range, timeline view, and a clear next step.

The first contact does not obligate you to order • Engineer site visit is free • We respond within the working day