Bereke Group
Bereke Group
Design & Build
Modern turnkey house by Bereke Group in Almaty
Almaty

Turnkey house construction

The full cycle from design to key handover. One contractor, one responsibility, a transparent process, and a clear budget.

One team
Full scope of work
Digital control
View projects
6-12
months from design to keys
100%
transparency through the mobile app

Full turnkey cycle: Design, approvals, construction, engineering systems, interior finishing, quality control, and transparent reporting, all within one system.

What turnkey means at Bereke Group

A single work system from design to handover of the finished house. One contractor coordinates the entire route, controls quality, and stays responsible for the final result.

1

Design and preparation

  • Architectural design
  • Structural solutions
  • Engineering systems
  • Approvals and permits
2

Core construction

  • Foundation works
  • Walls and slabs
  • Roof works
  • Facade envelope
3

Engineering systems

  • Power supply
  • Water and sewer
  • Heating and ventilation
  • Automation aligned with the project
4

Interior readiness

  • Rough finishing
  • Final finishing
  • Sanitary fixtures
  • Preparation for move-in
5

Control and documentation

  • Technical supervision
  • Hidden works acts
  • Laboratory control
  • As-built documentation
6

Acceptance and handover

  • Final inspection
  • Punch list closing
  • Engineering checks
  • Keys and document transfer

One responsibility line from start to finish

You work with one company across all stages. We coordinate designers, builders, engineers, and finish teams inside one management contour. You do not need to assemble fragmented contractors and connect them on your own.

Why one contractor is safer than a fragmented scheme

A comparison between the turnkey approach and the model where the client assembles separate contractors stage by stage.

Responsibility
Turnkey with Bereke Group

One contractor is responsible for the whole project

Fragmented scheme

Responsibility gets blurred between contractors

Coordination
Turnkey with Bereke Group

One manager synchronizes design, construction, and engineering

Fragmented scheme

The client has to connect separate teams manually

Budget
Turnkey with Bereke Group

A detailed estimate is built for the full work cycle

Fragmented scheme

Each stage is estimated separately, which creates surprise add-ons

Timeline
Turnkey with Bereke Group

The schedule is managed as one controlled route

Fragmented scheme

Delays accumulate between poorly synchronized stages

Quality
Turnkey with Bereke Group

One quality system works across the whole object

Fragmented scheme

Each contractor applies different standards

Guarantees
Turnkey with Bereke Group

One guarantee covers the house as a whole

Fragmented scheme

When issues arise, contractors shift responsibility to each other

Want to discuss a turnkey project without fragmented contractors?

We will show how the route is organized, which stages we take on, and where exactly the risks around budget, quality, and timing are reduced.

Get a consultation

From the first meeting to key handover

The entire turnkey route is organized as one managed process with clear stages, deadlines, and control points.

1-2 weeks

Consultation and site analysis

We start with an office or online meeting, discuss the brief, budget, timing, and lifestyle scenario, then assess the plot, terrain, utilities, and design inputs.

4-8 weeks

Design and detailed estimate

We prepare architectural, structural, and engineering solutions and calculate the full-cycle estimate so you understand the scope and budget before construction starts.

2-3 weeks

Preparation and launch

We sign the contract, open the client mobile app, prepare site logistics, build the schedule, and start with enabling works and the foundation.

3-6 months

Structural shell and roof

We build the foundation, walls, slabs, and roof system while documenting hidden works and checking geometry and execution quality at every key step.

2-4 months

Engineering and interior readiness

We install engineering systems, complete the agreed internal works, and bring the house to the planned handover state.

1-2 weeks

Acceptance and key handover

We carry out the final inspection, close remarks, transfer documentation, and explain the operation of the engineering systems.

A transparent process from day one

At every stage you can see the schedule, reports, documents, and current status in the mobile app. The team and the client work from the same project picture.

Quality control system

Quality control, the mobile app, and transparency

Every turnkey project is supported by a layered quality-control system, documentation discipline, and transparent reporting through the client mobile app.

Why it matters for the client

Full visibility: you know what is completed, what is in progress, and what comes next in the route.

Quality evidence: every critical decision is backed by acts, checks, and media records rather than only spoken promises.

Lower rework risk: issues are found before they turn into expensive hidden defects and conflict situations.

Technical supervision

An independent engineer checks that key works match the design and construction standards.

Hidden works acts

We document the foundation, reinforcement, waterproofing, and utilities before they are concealed.

Photo and video reporting

We regularly upload real media from site so you can see factual progress, not only verbal updates.

Laboratory and acceptance control

We verify critical materials, assemblies, and stage readiness before the project moves forward.

Client mobile app

The schedule, estimate, documents, reports, and team communication are available inside one digital system.

Ready-made solutions

House project catalog

Choose a project by style, area, and lifestyle scenario, adapt it to your site, and discuss the build.

Osaka 1Osaka 2Osaka 3
Minimalism

Osaka

455.2 м²
1 floor
fromKZT 73M
4 bedrooms
3 bathrooms
Garage
Terrace
Minimalism
Brick
View project
Oslo 1Oslo 2Oslo 3
Modern

Oslo

331.8 м²
2 floors
fromKZT 53M
3 bedrooms
2 bathrooms
Garage
Terrace
Modern
Brick
View project
Napoli 1Napoli 2Napoli 3Napoli 4
Neoclassical

Napoli

286 м²
1 floor
fromKZT 53M
5 bedrooms
4 bathrooms
Garage
Terrace
Neoclassical
Brick
View project
Kyoto 1Kyoto 2
Minimalism

Kyoto

211.1 м²
1 floor
fromKZT 40M
3 bedrooms
2 bathrooms
Terrace
Minimalism
Brick
View project
Antalya 1Antalya 2Antalya 3
Neoclassical

Antalya

272.3 м²
1 floor
fromKZT 50M
4 bedrooms
3 bathrooms
Garage
Terrace
Neoclassical
Brick
View project
Miami 1Miami 2Miami 3Miami 4
Hi-tech

Miami

420 м²
1 floor
fromKZT 67M
3 bedrooms
2 bathrooms
Garage
Hi-tech
Brick
View project

Not sure which project fits your site?

We can adapt a ready-made solution or develop an individual project for you.

Turnkey cost and common client mistakes

We break down how the turnkey budget is formed and which decisions most often lead to overspending and loss of control.

What the cost depends on

Area and number of floors

They directly affect the volume of structural, engineering, and finishing works.

Architectural complexity

Complex shapes, large spans, and non-standard nodes increase labor intensity.

Soils and foundation

Weak soils and level differences increase the demands on the base structure.

Engineering package

Heating, ventilation, automation, and electrical solutions can materially change the budget.

Handover readiness level

The turnkey package depends on how ready for living the house should be at transfer.

Transparent estimate: We calculate the project before contract signing so you understand the price logic, work scope, and budget range before entering construction.

Common client mistakes

Choosing a contractor by the lowest price

Hidden works and add-ons appear later, making the final price higher than expected.

Starting without a detailed estimate

The budget becomes impossible to control, and every change turns into a new unknown expense.

Using different contractors for each stage

Breaks appear between design, construction, and engineering in quality, timing, and responsibility.

Saving on quality control

Errors turn into hidden defects that are much more expensive to fix later.

How the turnkey approach reduces budget risk

A full picture before launch: the project scope, work package, and budget are discussed before site execution begins.

One responsibility contour: there are no gray zones between stages that later become disputed extra charges.

Systematic quality control: critical nodes are checked while issues are still cheap to correct.

Transparent reporting: decisions, acts, and project status stay visible inside one digital system.

Get a preliminary estimate

Tell us about the plot, area, and preferred house format. We will outline the budget range and the right next step for your project.

Calculate the cost

Frequently asked questions

Answers to the main questions about turnkey house construction in Almaty: timing, budget, control, work format, and the scope of the turnkey package.

The full work cycle: design, approvals, structural construction, engineering systems, documentation, quality control, and handover of the house in the agreed readiness state.

On average, 6-12 months from the start of design to key handover. The precise timeline depends on area, architectural complexity, terrain, engineering package, and the planned handover level.

The cost depends on area, project complexity, materials, engineering systems, and the work scope. We prepare a detailed estimate before the contract and fix the price for the agreed scope. Changes happen only if the brief changes.

You get the client mobile app with the schedule, photo and video reports, documents, and stage statuses. There is also regular contact with the project manager and scheduled control-point visits to site.

Yes. We review the existing design against regulations, plot conditions, and structural logic, refine it if needed, and then bring execution into one turnkey contour.

Ready to start your turnkey project?

We will discuss your plot, show relevant house examples, answer your questions, and outline the safest next step with a clear budget route.

Free consultation
Site visit
Preliminary estimate

Book a meeting

Visit our office or discuss the project online. We will review the brief, the plot, the work scope, and the initial budget direction together.

WhatsApp

Ask quick questions, send plot parameters, and get an initial response from the team.

Write on WhatsApp

Phone call

If it is easier to discuss the project by voice, call us directly and go through the first qualification scenario in just a few minutes.

Call now